0
0
Read Time:33 Second
NTPC’s total installed capacity reaches 62910 MW
New Delhi, July 20, 2020: Total installed capacity of NTPC Ltd, India’s largest power generation company has increased to 62910 MW.
800 MW, Unit-2 of Lara Super Thermal Power Project, has been added to Installed Capacity of NTPC on the successful completion of Trial Operation.
With this, the total installed capacity of NTPC and NTPC group has become 51155 MW and 62910 MW respectively.
With a total installed capacity of 62910 MW, NTPC Group has 70 Power stations comprising of 24 Coal, 7 combined cycle Gas/Liquid Fuel, 1 Hydro, 13 Renewables along with 25 Subsidiary & JV Power Stations.
About Post Author
Editor Desk
Antara Tripathy M.Sc., B.Ed. by qualification and bring 15 years of media reporting experience.. Coverred many illustarted events like, G20, ICC,MCCI,British High Commission, Bangladesh etc.
She took over from the founder Editor of IBG NEWS Suman Munshi (15/Mar/2012- 09/Aug/2018 and October 2020 to 13 June 2023).
Advertisements
Please enter a description
USD
Please enter a price
Please enter an Invoice ID